HSE Coordinator - Data Center Construction

Sundt · Temple, TX, United States

Posted 26 days ago

Apply faster with the Jobply extension

100% autofill on most job boards — review before submitting, or turn on auto-submit

Skills

Microsoft OfficePower BIExcelPPTE1Resource ManagementOSHAMSHA

Job description

Job Summary

The HSE Coordinator will support the HSE Department and work directly with the HSE Corporate Director and other Group/Region safety leaders to ensure a smooth running operation.

Key Responsibilities

1.    Arrange events or conferences and make travel arrangements as needed.
2.    Assist in the ordering, receiving, stocking and distribution of office supplies.
3.    Assist with other related clerical duties such as photocopying, faxing and filing.
4.    Coordinate the pick-up and delivery of courier mail and express mail services (Fed Ex, UPS, etc.).
5.    Creating and managing Power Bl Dashboards, Excel Spreadsheets, Word Documents (Agendas), Power Points, Graphs, etc.
6.    Maintain calendar of conference room appointments and training room events.
7.    Maintain calendars and appointments for Corporate Safety Director and Regional Safety Directors assigned.
8.    Manage Resource Management Staffing Tool.
9.    Process invoices and review budget material as assigned.
10.    Provide the necessary information for required OSHA and MSHA Reporting.
11.    Scheduling and coordinating various group and departmental Executive Safety, 1:1, other meetings, etc.
12.    Supporting the creation of HS&E training materials and help with distribution.
13.    Transcribe dictation, write letters and memos, and respond to correspondence.
14.    Update and distribute various directories and lists monthly.

Minimum Job Requirements

1.    Bachelor's degree or equivalent work experience preferred.
2.    Excellent interpersonal and customer service skills and the ability to multitask.
3.    Excellent oral and written communication skills.
4.    Minimum of 5 years of work experience in a construction /office environment
5.    Time management and organization skills.
6.    Working proficiency in Microsoft Office, Power Bl, Excel, PPT, E1.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1.    May stoop, kneel, or bend, on an occasional basis
2.    Must be able to comply with all safety standards and procedures
3.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4.    Will interact with people and technology frequently during a shift/work day
5.    Will lift, push or pull objects up to 50Ibs on an occasional basis.
6.    Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7.    Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

Job Summary

The HSE Coordinator will support the HSE Department and work directly with the HSE Corporate Director and other Group/Region safety leaders to ensure a smooth running operation.

Key Responsibilities

1.    Arrange events or conferences and make travel arrangements as needed.
2.    Assist in the ordering, receiving, stocking and distribution of office supplies.
3.    Assist with other related clerical duties such as photocopying, faxing and filing.
4.    Coordinate the pick-up and delivery of courier mail and express mail services (Fed Ex, UPS, etc.).
5.    Creating and managing Power Bl Dashboards, Excel Spreadsheets, Word Documents (Agendas), Power Points, Graphs, etc.
6.    Maintain calendar of conference room appointments and training room events.
7.    Maintain calendars and appointments for Corporate Safety Director and Regional Safety Directors assigned.
8.    Manage Resource Management Staffing Tool.
9.    Process invoices and review budget material as assigned.
10.    Provide the necessary information for required OSHA and MSHA Reporting.
11.    Scheduling and coordinating various group and departmental Executive Safety, 1:1, other meetings, etc.
12.    Supporting the creation of HS&E training materials and help with distribution.
13.    Transcribe dictation, write letters and memos, and respond to correspondence.
14.    Update and distribute various directories and lists monthly.

Minimum Job Requirements

1.    Bachelor's degree or equivalent work experience preferred.
2.    Excellent interpersonal and customer service skills and the ability to multitask.
3.    Excellent oral and written communication skills.
4.    Minimum of 5 years of work experience in a construction /office environment
5.    Time management and organization skills.
6.    Working proficiency in Microsoft Office, Power Bl, Excel, PPT, E1.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1.    May stoop, kneel, or bend, on an occasional basis
2.    Must be able to comply with all safety standards and procedures
3.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4.    Will interact with people and technology frequently during a shift/work day
5.    Will lift, push or pull objects up to 50Ibs on an occasional basis.
6.    Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7.    Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

Related job searches

Stop filling out the same form 100 times.

Install the free Jobply Chrome extension and auto-apply to HSE Coordinator - Data Center Construction and 1.2M+ other active jobs, with 100% autofill on most job boards.

Apply with Jobply — Free
✓ Free forever✓ No credit card