Job closed
Commissioning Building Manager (CBM) - Datacenter Construction Manager at Delan Associates, Inc is no longer accepting applications
Reno, NV, Nevada, United States · Posted about 2 months ago. Here are similar open jobs.
Job closed — view similar open Commissioning Building Manager (CBM) - Datacenter Construction Manager jobs in Reno, NV
Browse open jobs
Original job description (closed)
**Commissioning Building Manager (CBM) - Datacenter Construction Manager, Datacenter Project Manager**
**Reno, NV**
Duration: 12+ months
Schedule: 10/4 Rotational Shift
(10 Days Work and 4 Days Off) X 2 per month
**Key Skills: Cx Alloy, L1 - L5** *Commissioning Exp, Datacenter Exp*
*(Overall Building-Level Commissioning Authority – L1–L3 Commissioning Support-L4-L5 )*
**Primary Objective**
Own building-level commissioning execution, schedule integrity, energization governance, and cross-discipline coordination across Electrical, Mechanical, and Controls systems.
**A. Strategic Oversight**
- Accountable for L1–L3 completion within assigned building/vault
- Responsible to Coordinate Vendor and Subcontractor Support for L3-L5
- Protect energization sequencing and start up strategy.
- Align commissioning activities with:
- Micro-schedule
- Construction progress
- Customer milestones
- Control Activities
- Ensure compliance with Switch commissioning governance model.
**B. Gate Authority (L3 / Energization)**
- Confirm all three pillars before authorizing L3:
- QA/QC documentation readiness
- Site physical readiness
- Cx procedural readiness
- Dead buss checks on applicable equipment to prevent future power drops
- Resolve disputes between Site / QAQC / Cx.
- Escalate systemic risks impacting:
- MVTX / MCS lineups
- CHW loop energization
- Generator / ATS startup
- SCADA network stability/ Network live completion
**C. Leadership of Direct Reports**
- Direct oversight of:
- CxAlloy Manager (documentation & gate compliance)
- Cx Coordinator (field execution & startup)
- Validate alignment between system readiness and field execution.
- Drive accountability across trades and vendors.
**D. Issue Governance & Risk Management**
- Review and resolve conflict over issue severity classifications.
- Set closure thresholds: set timetables below to hold accountability, ensure procurement delays are tracked and coordinated for issues closure.
- High → Must close before energization 72hrs
- Moderate → Mitigation plan required 48hrs
- Low → Track to turnover 24hrs
- Identify trend failures (repeat deficiencies, documentation gaps, vendor underperformance).
Find your next role faster
The free JobPly Chrome extension writes a tailored resume and cover letter on supported boards, with 100% autofill on most job boards.